Development Milestone
In 2020 | Powertec Generator System Co.,Ltd., (Headquarter) was established Powertec Generator System Co.,Ltd. completed the share-holding reform. |
In 2018 | POWERTEC office in Shenzhen was relocated. Genset equipped with trail-emission treatment and complied to China Tier IV emission standard |
In 2017 | Branch office in Pakistan planned to build its own warehouse to meet the rapid increasing demand of local market. Sheet metal processing workshop expanded to 3000 m2 Was officially put into use. The Battery Business Department was set up to guarantee the Power supply of hybrid power system. |
In 2016 | Powertec Generator System Co.,Ltd was awarded as Provincial High-Tech Enterprises. The first hybrid generator set of POWERTEC was put into use. · POWERTEC realized the Standardized production of Silent type generator set and rapidly improve production capacity and quality. Indonesia branch company ran its official website in Indonesian.
|
In 2015 | Indonesia branch set up genset in stock warehouse |
In 2014 | POWERTEC was approved by Huiyang District Government to establish "Engineering &Technology Research Center for Energy Conservation and Informatization of Generator Sets". |
In 2013 | POWERTEC passed ISO9001 quality system certification, ISO14001 environmental system certification and OHSAS18001 Occupational Health System certification. |
In 2012
| POWERTEC R&D production Huizhou base completed relocation, and began producing. Shenzhen Powertec was awarded the title of Provincial high-tech enterprises.
|
In 2011
| POWERTEC R&D production Huizhou base was formally constructed. |
In 2010 | POWERTEC made inroad into sea terminal port.
|
In 2009 | POWERTEC provided on-site service of generator set for Indonesia and Pakistan users. Genset valume export to Philippine exceeded 10 million RMB.
|
In 2008
| The factory was relocated to Baohe Road, Longgang District, Shenzhen. The company was renamed as "Shenzhen Powertec Generation Equipment Co., LTD." POWERTEC passed ISO9001 quality system accreditation. POWERTEC began to export genserator set to the Philippines, South Africa, Indonesia and other area.
|
In 2005
| POWERTEC moved to Pingdi, Longgang District, Shenzhen, set up a factory and started the R&D and production of generator sets. |
In 2002 | POWERTEC built the its own property: POWERTEC Building. Our main business is the import of generator sets and providing technical services.
|
In 2000
| Shenzhen Powertec Innovative Generator Co., LTD was formally established. Later, it was renamed as "Shenzhen Powertec Generation Equipment Co., LTD" and continue to operate till now. |
In 1997 | POWERTEC Generator Set was founded in Shenzhen. Thanks for the support from clients.POWERTEC commiteed to resolve industrial technical problems, will treat our clients with integrity to pursue steady development. |